by Skylar Park | 19. Mar, 2026
EnergieLink: We are committed to your sustainability and lower operating costs Success Story: EnergieLink Grate Blocks 206+ in Long-Term Testing Our EnergieLink Grate Blocks 206+ have impressively demonstrated their performance capability — even under extreme...
by Michael Göldi | 29. Oct, 2025
Replacement of intermediate piece for waste feed chute Initial situation The existing intermediate section in the waste chute was leaking. In addition, the wear plates are worn out beyond the wear limit. Wear plates on stock were also found in poor condition. For the...
by Skylar Park | 2. Oct, 2025
Long-Term Partnership in Geneva Overall Revision Management We are proud to have been entrusted with the maintenance of our customer’s two incineration lines in Geneva for many years. Our work covers key components such as the grate, grate drive, de-slagging, and ash...
by Natalia Ludwig | 15. Feb, 2024
Replacement of deslagger system Initial situation As part of the Waste Ordinance, the legislator has stipulated lower residual metal contents in bottom ash. On the one hand, this is in order to be able to utilise slag from waste incineration plants even more...
by Michael Göldi | 18. Jul, 2023
Replacement and optimisation of the feed chute Initial situation After many years, the customer’s feed chute had exceeded its service life and needed a replacement. The customer was looking for a partner being able not only to replace the feed chute, but also...
by Michael Göldi | 17. Jul, 2023
Replacement and optimisation of the feed chute Initial situation The previously installed feed chutes showed heavy wear due to enormous influence of heat, causing frequent leakages in the cooling circuit. This resulted in several plant shutdowns per year and line. The...