EnergieLink: We are committed to your sustainability and lower operating costs
Success Story: EnergieLink Grate Blocks 206+ in Long-Term Testing
In a waste-to-energy plant in the Netherlands, our 206+ blocks were in operation for a period of more than two years in the highly stressed grate zones 2 and 3. These areas are well known for their demanding thermal and mechanical conditions. In particular due to the enhanced throughput the plant operates on.
Throughout the entire operating period, our grate blocks showed exceptional stability: they continuously withstood high temperatures and highly abrasive influences while ensuring constant, reliable primary air supply at all times. The two most critical wear issues — clogging of the air channels caused by soft metals and general material abrasion — were largely reduced.
Results after more than two years of operation
- Stable primary air supply over the complete test period — almost no blocked air openings
- Permanent and stable alignment of the grate blocks
- No structural damage observed and burn-off loss drastically reduced
- Wear on the running surface was minimised
Our Conclusion
The two-year continuous operation and analysis phase confirms the outstanding material quality and robust construction of our EnergieLink Grate Blocks 206+.
With this, we provide a durable and high-performance solution for operators of waste-to-energy plants — making an active contribution to improved plant availability, predictable operational reliability, and sustainable long-term performance.
Contact us for further information.
Facts & figures
Contact us for further information.
Horst Lumplecker
Head of Sales
Tel +41 76 572 59 71