MHKW Darmstadt
EnergieLink was commissioned with the planning and control of a five-week complete shutdown management overhaul revision of the three incineration lines at the MHKW Darmstadt.


Infos:
Highest efficiency and pinpoint timing:  The total stoppage of the three incineration lines currently being performed, was planned and implemented by EnergieLink.  Within the scope of this revision, extensive refurbishment and construction measures have been successfully performed within a very tightly defined time window. EnergieLink managed the planning and coordination of all suppliers. The daily building management meeting and daily monitoring of the construction progress on-site, were managed by our engineers. Thus, the quality of the inspection work could be ensured to the same extent as the planned re-commissioning of the waste incineration plant.